In practice, engineers in building services use previous solutions and adapt them to new problems. In order to deal with more complex geometry and larger problems, we have used a hybrid approach: Case Based Reasoning (CBR) within Constraint Satisfaction Problem (CSP) approaches. From the specification of the building 3D model, our software proceeds through different steps from the determination of the standard number and size of fan coils to the generation of 3D solutions. In this paper an object-based CAD programming is used to take advantage of standardization to handle the schematic design, sizing, layout for services in a building ceiling void. Timmermans (eds.) Recent Advances in Design & Decision Support Systems in Architecture and Urban Planning, Dordrecht: Kluwer Academic Publishers, ISBN: 1-4020-2408-8, p. Hybrid Approach to Solve Space Planning Problems in Building Services
0 Comments
Leave a Reply. |